Euclid Street Airbnb Week 3: Bathroom Basics and Kitchen Backsplash
We are still catching up from repairing all the lovely things we found beneath the layers and old drywall. We didn’t get to the tile, but we are very close. Kasey spent a lot of time in the bathroom this week fixing plumbing, bathroom fans, GFI outlets and getting new hardy backer wallboard up!
Here’s what we did this week:
Move 2nd fridge to wine cellar and temporarily move the kitchen fridge into one of the storage areas
Drywall rework/ spackling in the kitchen
Get the flooring inside and acclimating to the basement
Replace the fan in the bathroom
Repair shower plumbing
GFI outlets in the bathroom
Picked out and order a light fixture, the electrical you run depends on the design
Electrical for bathroom light fixture
Put up hardy board in bathroom and kitchen
Strip and prime the steel cabinets for the sink
Clean, prep and prime the baseboard radiators
Mulvaney 2-Light Vanity, Bathroom
While we were hoping to have some tile done by the end of this week, it was just too ambitious. Kasey got the important things fixed and updated in the bathroom, so now we can all feel a little better on what is behind the walls. It looks like tiling and wall paint are going to happen in this upcoming week and the bamboo floor will fall in week 5.