Euclid Street Airbnb Week 1: Progress Update and the Full Before Tour
Week 1 is behind us! So far we are 100% on track. Below is the check list and the pictures of our progress! We got all of our hobby stuff out of the “airbnb-to-be” space and into their new homes!
WEEK 1: Wine Room and Workshop Displacement
Clear out our stuff from the side storage room
Scrub and Kilz paint the walls and floor
Rebuild shelving structure to full use space and create room for wine equipment
Add a double basin sink. This includes connecting a drain up to the main stack (luckily right next to it. We are also lucky to have water hook ups.
Move wine making table and equipment into the new room
Get electricity run to the garage
Move work bench to garage, along with tools
Look at flooring options (vinyl laminate, laminate, or ceramic tile, refinished concrete floor)
The Before Tour!
The End
We hope you were thoroughly disgusted.. it only makes for more gratifying after pictures! This concludes the Before Tour. Tune in next week for Demolition Days! Remember, it always gets worse before it gets better.